{"id":11067,"date":"2025-06-13T20:52:24","date_gmt":"2025-06-13T20:52:24","guid":{"rendered":"https:\/\/www.scaffoldmfg.com\/?p=11067"},"modified":"2025-06-13T20:52:24","modified_gmt":"2025-06-13T20:52:24","slug":"fitting-scaffold-aluminum-material-914-1219mm-sizeoemodmcustom-pre-galvanized-surface-treatment-silver-color-project-site","status":"publish","type":"post","link":"https:\/\/www.scaffoldmfg.com\/fr\/fitting-scaffold-aluminum-material-914-1219mm-sizeoemodmcustom-pre-galvanized-surface-treatment-silver-color-project-site\/","title":{"rendered":"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site"},"content":{"rendered":"<p>Qingdao WanchengTai is a scaffolding system manufacturer. Based on the continuous production lines, we can provide a massive quantity of scaffolding products at competitive prices. Our products are Ringlock Scaffolding System,Kwikstage Scaffolding System,Cuplock Scaffolding System,Base &#038; Jacks,Pipe &#038; Fitting Scaffold,Shoring Props, etc. Established to design and manufacture scaffolding in the very beginning, We added the other technological formwork and scaffolding systems to its product range in a short period.<\/p>\n<p>Our products are widely used in bridge engineering,civil engineering,industrial facilities,repair and refurbishment,construction of buildings. We improved its product range continuously by integrating engineering background and experience with an innovative insight and brought into practice by utilizing advanced level manufacturing technology.After years of development, our products have been exported to many countries such as Chile,United States,Thailand,Pakistan,Arabia,Malaysia,Russia,Korea,Netherlands,Algeria,Mayotte, etc.<\/p>\n<p><strong><\/strong><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2022\/06\/Italy-type-scaffolding-swivel-coupler.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p>For Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site, we established thorough quality control and inspection system. To fulfill the more and more varied requirements, we continuously keep upgrading our production capabilities from manual welding production to modern automated welding lines.<\/p>\n<p><b>Some information about Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site:<\/b><\/p>\n<table class=\"table  table-bordered text-center\">\n<thead><\/thead>\n<tbody>\n<tr>\n<td>Company<\/td>\n<td>WanchengTai<\/td>\n<\/tr>\n<tr>\n<td>N\u00b0 de pi\u00e8ce<\/td>\n<td>WTSTHR-2527<\/td>\n<\/tr>\n<tr>\n<td>Service apr\u00e8s-vente<\/td>\n<td>Assistance technique en ligne<\/td>\n<\/tr>\n<tr>\n<td>Capacit\u00e9 de solution de projet<\/td>\n<td>conception graphique, solution globale pour les projets<\/td>\n<\/tr>\n<tr>\n<td>Type<\/td>\n<td>Base et v\u00e9rins&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>Garantie<\/td>\n<td>3 years<\/td>\n<\/tr>\n<tr>\n<td>Service apr\u00e8s-vente<\/td>\n<td>Assistance technique en ligne<\/td>\n<\/tr>\n<tr>\n<td>Application<\/td>\n<td>industrial facilities,bridge engineering&#8230;<\/td>\n<\/tr>\n<tr>\n<td>Style de conception<\/td>\n<td>Industriel<\/td>\n<\/tr>\n<tr>\n<td>Lieu d'origine<\/td>\n<td>Qingdao, Chine<\/td>\n<\/tr>\n<tr>\n<td>Num\u00e9ro de mod\u00e8le<\/td>\n<td>Syst\u00e8me d'\u00e9chafaudage - 529<\/td>\n<\/tr>\n<tr>\n<td>Payment<\/td>\n<td><span style=\"font-family: Poppins, Helvetica, sans-serif; font-size: 13px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400; letter-spacing: 0.16px;\">Paypal,T\/T,Western Union&#8230;<\/span><\/td>\n<\/tr>\n<tr>\n<td>Product Features<\/td>\n<td>environment\u00a0protection,security&#8230;<\/td>\n<\/tr>\n<tr>\n<td>Couleur<\/td>\n<td>Exigences des clients<\/td>\n<\/tr>\n<tr>\n<td>Taille<\/td>\n<td>Bay Length 2.4mm,&nbsp;Lift Height&nbsp;1.6mm, Width595mm \/ Standard Size<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><font color=\"#0000ff\">&nbsp;Please note<\/font>: The above table data is for reference only. For specific information, please contact us.<\/p>\n<p style=\"text-align: center;\"><b>Our factory and workshop<\/b><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-11.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p style=\"text-align: center;\"><b>Syst\u00e8me d'\u00e9chafaudage<\/b><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-3.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p><strong><\/strong><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-4.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p><strong><\/strong><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-5.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p><strong><\/strong><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-6.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p><strong><\/strong><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-7.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p><strong><\/strong><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-9.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p style=\"text-align: center;\"><b>Our Certificatess<\/b><\/p>\n<p style=\"text-align:center;\"><img src=\"https:\/\/www.scaffoldmfg.com\/wp-content\/uploads\/2024\/04\/Scaffolding-system-12.jpg\" alt=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\" title=\"Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site\"><\/p>\n<p><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-bottom kksr-disabled\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;11067&quot;,&quot;readonly&quot;:&quot;1&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;4&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 vote)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Fitting Scaffold Aluminum material 914-1219mm size(OEM,ODM,CUSTOM) pre-galvanized Surface treatment Silver color project site&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 4px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            <span class=\"kksr-muted\">Notez cet article<\/span>\n    <\/div>\n    <\/div>","protected":false},"excerpt":{"rendered":"<p>Qingdao WanchengTai is a scaffolding system manufacturer. Based on the continuous production lines, we can provide a massive quantity of scaffolding products at competitive prices. Our products are Ringlock Scaffolding System,Kwikstage Scaffolding System,Cuplock Scaffolding System,Base &#038; Jacks,Pipe &#038; Fitting Scaffold,Shoring Props, etc. Established to design and manufacture scaffolding in the very beginning, We added the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":7026,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102],"tags":[],"class_list":["post-11067","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/posts\/11067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/comments?post=11067"}],"version-history":[{"count":1,"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/posts\/11067\/revisions"}],"predecessor-version":[{"id":11068,"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/posts\/11067\/revisions\/11068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/media\/7026"}],"wp:attachment":[{"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/media?parent=11067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/categories?post=11067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scaffoldmfg.com\/fr\/wp-json\/wp\/v2\/tags?post=11067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}